Up Home » Liberty CSD Construction Project » Aug 2010 Prev Next Slideshow

ES cafeteria | Although it is still filled with equipment and building materials, the new cafeteria will be a large space, which includes a drop down partition (the partial blue “wall” in upper left of the photo) to create a multi-purpose room. Download

 Previous image  Next image  Index page
ES_newclassroom5
ES_newclassroom6
ES_overhang2
ES_overhang
ES_overhang3_exterior
  ES_cafeteria.JPG - Although it is still filled with equipment and building materials, the new cafeteria will be a large space, which includes a drop down partition (the partial blue “wall” in upper left of the photo) to create a multi-purpose room.  
ES_cafeteria2
ES_cafeteria3
ES_cafeteria4
ES_oldcaf
ES_oldcaf2

Total images: 55 | Help